Automatic Liquid Mineral Water Filling Machine
High-speed production complete line with capacity of 8,000-60,000 bottles per hour for carbonated beverage aluminum filling operations.
We supply complete solutions for juice filling machines, including:
- Water treatment system
- Juice mixing system
- UHT Sterilizer
- Washing filling capping machine
- Code sprayer
- Automatic labeling machine
- Automatic packing machine
- Automatic Palletizer system
Container Specifications
| Material |
Shape |
Filling Volume |
Filling Level |
Neck Type |
| PET Bottle |
Square or Round Bottle |
100-2000ml |
Distance from bottle neck according to request |
As requested |
Adjustable Bottle Specifications
(Middle Mould Base) Bottle diameter ≤105mm, Bottle Height≤335mm
Customers need to purchase additional change-over parts for different bottle types. If using square bottles, a bottle separating system will be added.
Juice Preparation
Fruit, Concentrate, Powder mixing, and more
Packaging & Control Systems
| Container Label & Control Mode |
Packaging System |
Palletizing System |
Hot Melt Roll-Fed PVC Shrink Label Full Label/Half Label Manual/Automatic |
Packing system |
Manual |
Palletizer Options
- Low position gantry palletizer
- Robot Palletizer
- High position gantry palletizer
- Single Arm Palletizer
- Manual Palletizer
Packing Machine Specifications
| Type |
Minimum Specification |
Operation |
Film shrinker Wrap Around packer Robert Packing Machine |
1*2 2*3 3*4 4*6 3*5 |
Manual |
Operating Conditions
Temperature: 10~40ºC; Humidity: No dew
Electrical Specifications
Voltage: 380V±5%, 3 phase; Frequency: 50HZ±1%
Detailed Photos
Our Manufacturing Advantages
Advanced Production Facilities
Standardized workshop of 40,000 square meters with our own part manufacturing center to guarantee part quality and strong annual production capacity.
Precision Processing Equipment
Multiple processing units including water jet cutter, plasma cutter, laser cutter, and CNC machines from Taiwan Chevalier & Korea Daewoo ensure part precision.
Quality Certifications
International certifications including ISO9001:2001, CE Certificate, SGS, COC, TUV, and more than 30 invention patents.
Rigorous Testing
Equipment undergoes 24-hour testing before leaving the factory to ensure smooth water pipeline operation and pneumatic, electrical, and mechanical stability.
Additional Advantages
- Sufficient stock of spare parts ensures timely delivery and supply
- Experienced engineers capable of producing different capacity products and creating optimized layouts
- Professional English-speaking installation team for rapid deployment
- World top brands parts to guarantee high quality
After Sales Service
Installation & Debugging
Seasoned technicians provide equipment installation, debugging, and test production to reach rated production capacity. Buyer provides round tickets, accommodation, and salary for our engineers.
Comprehensive Training
Technology training covering equipment structure, maintenance, control, and operation. Technicians guide and establish training outlines to ensure mastery of operation and maintenance.
Quality Guarantee
All goods are new and unused, made of suitable materials with new designs. Products can store for one year without adding any aseptic.
After Sales Support
12-month quality guarantee with free wearing parts and lowest prices for other parts. Continuous technical support and favorable pricing for spare parts after guarantee period.
Frequently Asked Questions
Q1: Do you have reference projects?
A1: We have reference projects in most countries. With customer permission, we can provide contact information for factory visits. You're welcome to visit our company and see machines running in our factory. Contact our sales team for reference machine videos.
Q2: Do you provide customized service?
A2: We design machines according to your requirements (material, power, filling type, bottle types) while providing professional suggestions based on our extensive industry experience.
Q3: What's your quality guarantee or warranty?
A3: We offer high quality machines with 1-year guarantee and life-long technical support.
Q4: How long for installation?
A4: Installation typically takes 10-25 days depending on your machine order, with 1-2 engineers sent to your plant.